How Many Yards of Concrete for a 24x32 Slab? (2026 Cost & Rebar)

Direct Answer: A 24'×32' (768 sq ft) slab requires 10.43 cubic yards at 4" thick (9.48 raw + 10% waste) or 15.64 cubic yards at 6" thick for a shop or vehicle lift. Add +5.32 yd³ for a 12"×18" monolithic perimeter footing.

Customize Your 24' × 32' Pour

768 Sq Ft
Slab Concrete Thickness

4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.

Exact Ready-Mix Order for 24' × 32' (4" Thick)2 Ready-Mix Trucks (9.5 yd³ each)
15.8 Cubic Yards(14.3 raw + 10% waste)
Concrete Material
$2,678
@ $170/yd³
Turnkey Poured Est.
$7k–$10k
Labor, rebar & finish
#4 Rebar (16" OC)
68 Sticks
20-ft bars + 12% lap
4" Gravel Base
16 Tons
#57 crushed stone
Pour Breakdown: Flat 4" slab = 9.48 yd³ + 112 LF monolithic perimeter footing = 4.84 yd³. Mixing by hand would require 709 bags of 80-lb concrete mix—always order ready-mix transit trucks for a 24x32 structural slab.
24x32 Concrete Slab Thickness, Monolithic Footing & 2026 Cost Matrix
Slab ThicknessFlat Order (w/ 10% Waste)With 12"×18" Monolithic EdgeReady-Mix TrucksBest Application
4 Inches (3,500 PSI)10.43 yd³15.8 yd³2 truck(s)Residential living area, patio, light passenger cars
5 Inches (4,000 PSI)13.04 yd³18.4 yd³2 truck(s)Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min)
6 Inches (4,000 PSI)15.64 yd³21.0 yd³2 truck(s)RV storage bays, tractors, heavy mechanic workshops
8 Inches (4,500 PSI)20.86 yd³26.2 yd³3 truck(s)Commercial fleet semi-trucks & heavy machinery

Frequently Asked Questions — 24x32 Concrete Slabs

How many cubic yards of concrete do I need for a 24x32 slab?

A 24' × 32' (768 sq ft) slab at 4 inches thick needs 9.48 raw cubic yards, or 10.43 cubic yards with a standard 10% waste buffer (2 ready-mix trucks). At 6 inches thick for a shop or vehicle lift, order 15.64 cubic yards.

How much does a 24x32 concrete slab cost in 2026?

Ready-mix concrete delivery alone for a 4-inch 24x32 slab costs roughly $1,617 to $1,930 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (68 sticks), forming, and finishing averages $5,299 to $7,987.

How much extra concrete does a monolithic thickened edge add to a 24x32 slab?

A standard 12"-wide × 18"-deep monolithic perimeter footing around the 112 linear feet of a 24x32 slab adds approximately 5.32 cubic yards (including 10% over-excavation buffer).