How Many Yards of Concrete for a 24x28 Slab? (2026 Cost & Rebar)
Direct Answer: A 24'×28' (672 sq ft) slab requires 9.13 cubic yards at 4" thick (8.3 raw + 10% waste) or 13.69 cubic yards at 6" thick for a shop or vehicle lift. Add +4.94 yd³ for a 12"×18" monolithic perimeter footing.
Customize Your 24' × 28' Pour
672 Sq Ft4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.
| Slab Thickness | Flat Order (w/ 10% Waste) | With 12"×18" Monolithic Edge | Ready-Mix Trucks | Best Application |
|---|---|---|---|---|
| 4 Inches (3,500 PSI) | 9.13 yd³ | 14.1 yd³ | 1 truck(s) | Residential living area, patio, light passenger cars |
| 5 Inches (4,000 PSI) | 11.41 yd³ | 16.4 yd³ | 2 truck(s) | Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min) |
| 6 Inches (4,000 PSI) | 13.69 yd³ | 18.6 yd³ | 2 truck(s) | RV storage bays, tractors, heavy mechanic workshops |
| 8 Inches (4,500 PSI) | 18.25 yd³ | 23.2 yd³ | 2 truck(s) | Commercial fleet semi-trucks & heavy machinery |
Frequently Asked Questions — 24x28 Concrete Slabs
How many cubic yards of concrete do I need for a 24x28 slab?
A 24' × 28' (672 sq ft) slab at 4 inches thick needs 8.3 raw cubic yards, or 9.13 cubic yards with a standard 10% waste buffer (1 ready-mix truck). At 6 inches thick for a shop or vehicle lift, order 13.69 cubic yards.
How much does a 24x28 concrete slab cost in 2026?
Ready-mix concrete delivery alone for a 4-inch 24x28 slab costs roughly $1,415 to $1,689 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (60 sticks), forming, and finishing averages $4,637 to $6,989.
How much extra concrete does a monolithic thickened edge add to a 24x28 slab?
A standard 12"-wide × 18"-deep monolithic perimeter footing around the 104 linear feet of a 24x28 slab adds approximately 4.94 cubic yards (including 10% over-excavation buffer).