Exact 1,120 Sq Ft Pour Takeoff • 1,120 Sq Ft Starter Barndominium or Pole Barn

How Many Yards of Concrete for a 28x40 Slab? (2026 Cost & Rebar)

Direct Answer: A 28'×40' (1,120 sq ft) slab requires 15.21 cubic yards at 4" thick (13.83 raw + 10% waste) or 22.81 cubic yards at 6" thick for a shop or vehicle lift. Add +6.46 yd³ for a 12"×18" monolithic perimeter footing.

Customize Your 28' × 40' Pour

1,120 Sq Ft
Slab Concrete Thickness

4" = residential/patio • 5"–6" = shop bays, RV storage & 2-post car lifts.

Exact Ready-Mix Order for 28' × 40' (4" Thick)3 Ready-Mix Trucks (9.5 yd³ each)
21.7 Cubic Yards(19.7 raw + 10% waste)
Concrete Material
$3,685
@ $170/yd³
Turnkey Poured Est.
$10k–$14k
Labor, rebar & finish
#4 Rebar (16" OC)
98 Sticks
20-ft bars + 12% lap
4" Gravel Base
23 Tons
#57 crushed stone
Pour Breakdown: Flat 4" slab = 13.83 yd³ + 136 LF monolithic perimeter footing = 5.88 yd³. Mixing by hand would require 976 bags of 80-lb concrete mix—always order ready-mix transit trucks for a 28x40 structural slab.
28x40 Concrete Slab Thickness, Monolithic Footing & 2026 Cost Matrix
Slab ThicknessFlat Order (w/ 10% Waste)With 12"×18" Monolithic EdgeReady-Mix TrucksBest Application
4 Inches (3,500 PSI)15.21 yd³21.7 yd³2 truck(s)Residential living area, patio, light passenger cars
5 Inches (4,000 PSI)19.01 yd³25.5 yd³3 truck(s)Full-size 3/4-ton trucks, 2-post car lift (4.5"+ min)
6 Inches (4,000 PSI)22.81 yd³29.3 yd³3 truck(s)RV storage bays, tractors, heavy mechanic workshops
8 Inches (4,500 PSI)30.42 yd³36.9 yd³4 truck(s)Commercial fleet semi-trucks & heavy machinery

Frequently Asked Questions — 28x40 Concrete Slabs

How many cubic yards of concrete do I need for a 28x40 slab?

A 28' × 40' (1,120 sq ft) slab at 4 inches thick needs 13.83 raw cubic yards, or 15.21 cubic yards with a standard 10% waste buffer (2 ready-mix trucks). At 6 inches thick for a shop or vehicle lift, order 22.81 cubic yards.

How much does a 28x40 concrete slab cost in 2026?

Ready-mix concrete delivery alone for a 4-inch 28x40 slab costs roughly $2,358 to $2,814 ($155–$185/yd³). A full turnkey contractor-poured 4-inch slab with gravel base, vapor barrier, #4 rebar (98 sticks), forming, and finishing averages $7,728 to $11,648.

How much extra concrete does a monolithic thickened edge add to a 28x40 slab?

A standard 12"-wide × 18"-deep monolithic perimeter footing around the 136 linear feet of a 28x40 slab adds approximately 6.46 cubic yards (including 10% over-excavation buffer).